Karbi Langpi Hydro Electric Project
The Karbi Langpi Hydro Electric Project is located in the West Karbi Anglong District of Assam, about 125Km from the State capital Guwahati. The Project envisages generation of 2X50 MW of electricity by constructing a concrete gravity dam with gated spillways on the river Karbi Langpi near Hatidubi and diverting the river flow through an intake structure and low pressure 4430 m long, 4.20 diameter horse-shoe shaped tunnel to the Power House.